Agenda
Hosted by
Department of Chemical Engineering
The University of Texas, Austin, Texas 78712
February 2 - 3, 2009
ACES Building – Room 2.402
Monday, February 2, 2009
| 8:30 a.m. | Coffee and Donuts | |
| 9:00 | Introduction/Agenda Overview | T. Edgar, UT |
| 9:10 | PI Overviews | |
| 10:10 | Advances and Challenges in Nonlinear Model Predictive Control: Algorithms and Applications | |
| 10:40 | Break | |
| 10:50 | Nonlinear Fault Diagnosis by Using State Estimators | |
| 11:10 | Fault Detection and Virtual Metrology in the Etching Step of Semiconductor Manufacturing | |
| 11:30 | Monitoring of Process Fouling Using First Principles Modeling and Moving Horizon Estimation | |
| 11:45 | Lunch (O’s dining room ACES 2.222) | |
| 1:00 | Automated Tuning Method for Optimal MPC Control Performance with Process Model Mismatch | |
| 1:30 | Moving Horizon State Estimation Using In Situ Adaptive Tabulation | |
| 2:00 | Optimization and Control of CO2 Removal from Flue Gases | |
| 2:30 | Break | |
| 2:45 | Application of Multivariable Control in Wafer-to-Wafer Control of Plasma Etching Systems | |
| 3:00 | Wireless Feedback Control |
D. French (UT) |
| 3.20 | Capacitance-Resistive Modeling for Optimization of Large Scale Reservoir Systems | |
| 3:50 | Recent Advances in Optimization | |
| 4:20 | Poster Session | |
| 5:30 | Adjourn | |
| 6:30 | Dinner – Threadgills, 301 W. Riverside (472-9304) |
Poster Session
Student |
Poster Title |
S. Abrol |
Moving Horizon State Estimation Using In Situ Adaptive Tabulation |
| C. Alcala | Total Projection to Latent Structures for Process Monitoring |
I. Castillo |
|
D. French |
Wireless Feedback Control |
B. Gill |
Fault Detection and Virtual Metrology in the Etching Step of Semiconductor Manufacturing |
B. Parkinson |
Application of Multivariable Control in Wafer-to-Wafer Control of Plasma Etching Systems |
Q. Shen |
Fault detection In Subcutaneously Implanted Continuous Glucose Monitoring |
B. Spivey |
Monitoring of Process Fouling Using First Principles Modeling and Moving Horizon Estimation |
D. Thiele |
Automated Tuning Method for Optimal MPC Control Performance with Process Model Mismatch |
D. Weber |
Capacitance-Resistive Modeling for Optimization of Large Scale Reservoir Systems |
S. Ziaii |
Optimization and Control of CO2 Removal from Flue Gases |
B. Stewart |
Cooperative Model Predictive Control with Resource Management for Coupled Input Constraints |
Tuesday, February 3rd
| 8:00 a.m. | Meeting with PI’s and Sponsors – Continental Breakfast | |
| 9:00 | ICES Overview | T. Oden/J. Bass (UT) |
| 9:45 | Break | |
| 10:00 | MIMO Constrained Control Monitoring | J. Qin (USC) |
| 10:45 | Cooperative Model Predictive Control with Resource Management for Coupled Input Constraints | B. Stewart (UW) |
| 11:15 | Total Projection to Latent Structures for Process Monitoring | C. Alcala (USC) |
| 11:45 | Adjourn |